Lab construction is proceeding rapidly and smoothly. The inner core of the reactor has been completed. The graphite rods will be loaded as a next step. And then the space will be filled with cooling water.

Or, more likely, this is the basement the dilution fridge trench. It is much more sophisticated than what I have sketched. You can see a deeper pit and sinks. This structure will be covered by concrete and the trench that I requested for the fridges will sit above. I think this is a flood security system.

Many thanks to Wilson Architects for keeping me updated.

Advertisements

From → newlab, Uncategorized

Leave a Comment

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: